JSS 55555 SPECIFICATIONS IN DETAIL PDF DOWNLOAD

RELATED SPECIFICATIONS Joint Services Specifications JSS Revision No. In such cases the details shall be as given in the relevant. 16 Jul For more details, refer Procedure 6, Test Condition K, Page no of Refer Test No, Page no of Defence Standard JSS Product should meet all environmental Specification as per JSS , Revision No 2, Year , Clause L-2B. The following Test is carried out on product.

Author: Yozshular Kikinos
Country: Bhutan
Language: English (Spanish)
Genre: Education
Published (Last): 8 May 2005
Pages: 356
PDF File Size: 2.69 Mb
ePub File Size: 6.41 Mb
ISBN: 759-4-87575-239-9
Downloads: 48695
Price: Free* [*Free Regsitration Required]
Uploader: Tashicage

The control panel consist of all the electrical switchgears and operating instruments needed for a smooth operation of the Driving rain test facility.

Assembly And Testing

The Driving rain test facility is divided into multiple zones. The Driving rain test facility is made of Brick wall up to 1 meter height on two sides with special foundation.

Each main header pipe will have pressure jss 55555 specifications in detail along with strainer to protect the nozzle blocks from dust particles. Description Shower Area No. Powder coated MS specificatipns structure is used for long life.

Most Related  ROBOTECH NEW GENERATION SOURCEBOOK PDF DOWNLOAD

All the nozzles are mounted on the header pipes which in turn is connected to the main header pipe.

Test Space Test Bed: The centre of the test bed have a water channel with a MS grated covering. Features Super Structure The super structure is built using GI frames with anti-corrosive coating and profiles to support the pipelines.

Detsil Station The main control station is provided in the control room. Water Recirculation System A closed loop water circulation system consists of industrial grade pumps for the discharge of water.

Environmental testing

The operation of these zones is as per the requirement of JSS The sprayed water is recirculated through a water channel, passing through a filtration system and returns to the main water sump. Reinforced concrete test bed with a Jss 55555 specifications in detail gradient towards centre and load bearing capacity of up to 1 to 1.

The main control station is provided in the control room. Overview Features Technical Specifications.

Most Related  6ES7138-4CB11-0AB0 EBOOK

The super structure is built using GI frames with anti-corrosive coating and profiles to support the pipelines. The twin shower area with 1.

Assembly And Testing – ELCOM GROUP

Header Pipes All the nozzles are mounted on the header pipes which in turn is connected to the main header pipe. The nozzles can be easily removed for revalidating the pressure.

JanuaryOur Booth No. The control station consists of a stand-alone IP55 protected control cum operating panel.

The width of the super structure can be adjusted and one side of the structure can be moved on guided wheels. Jss 55555 specifications in detail The Driving rain test facility is divided into multiple zones. A closed loop water circulation system consists of industrial grade pumps for the discharge of water.